Microsoft Eggborough

Microsoft · proposed · North Yorkshire Council

Two-building campus proposed on part of the former Eggborough coal power station (closed 2018). No live planning application link recorded yet.

Stated size

Not disclosed

No megawatt figure in materials reviewed

Operators often omit a megawatt figure. Map circles then use site area instead. Stated size is not electricity use.

Site area

Unknown

ex-industrial / brownfield

What was here: Former 1,960 MW Eggborough coal power station site (closed 2018)

Water

Not disclosed

No annual water figure in materials reviewed

Equivalences

No operator on this map discloses expected load factor (the share of peak power used on average), so yearly electricity figures are shown as a range, not as a known total.

Claims on record

None recorded yet.

Disclosure checklist

Plain checklist, no aggregate score.

Right of reply

Right of reply: open; no response received. Email marco@prismaticlabs.ai. Subject is prefilled. Or see methodology.

Timeline

  1. 2024-02: Microsoft hosts community events on proposals for a data centre on part of the former Eggborough Power Station site; mid-2024 planning submission aimed

Sources

No live planning application link recorded yet. We do not upgrade a site past “proposed” without one.

Map point: longitude -1.126, latitude 53.705. Last reviewed 2026-07-15.