The Yorkshire Compute Belt

AI and cloud leave a physical footprint: power, land, and water. This map puts data centres across Yorkshire, the Humber, and Teesside, and those figures, where communities can see them.

Display

Zoom

Overlay

Live bids drawn as indicative areas. None is designated yet. About these bids

How to read the circles

Colour = planning status

  • Proposed
  • In planning
  • Approved
  • Building
  • Operating

Outline = size disclosed

  • Solid fill: megawatts published
  • Dashed: megawatts not disclosed (sized by site area, or location only if area unknown)

Grey demos above are style only, not a status colour.

Size = stated megawatts when known

5 MW
100 MW
1 GW

Regional footprint

11 sites · 1,384 MW in planning documents, plus 395 MW stated only by operators · 865 acres of land take · 5 with power not disclosed . Megawatts are stated sizes on paper for proposed or approved schemes, not running load; no operating site here publishes a figure.

Site Status Stated size Site area
Microsoft Skelton Grange proposed Not disclosed 48 acres · brownfield
Microsoft Eggborough proposed Not disclosed Unknown · brownfield
Drax data centre proposed 100 MW · first stage only Unknown · industrial
Elsham Tech Park in planning 1,000 MW · biggest size stated for this site 435 acres · farmland
Humber Tech Park approved 384 MW · IT equipment only 188 acres · farmland
Deep Green Bradford proposed 5.6 MW · biggest size stated for this site 1 acres · industrial
Mountpark Ferrybridge (data-centre plot) proposed Not disclosed 40 acres · brownfield
Wilton International data centre (Phase 1) proposed 280 MW · biggest size stated for this site 38 acres · industrial
Teesworks data centre campus approved Not disclosed 115 acres · brownfield
Latos Preston Farm (Stockton) proposed 9.5 MW · biggest size stated for this site Unknown · industrial
aql Leeds data centres operating Not disclosed Unknown · brownfield