Elsham Tech Park

Elsham Tech Park Ltd · in planning · North Lincolnshire Council

Outline application for up to 1 gigawatt of computing equipment power across up to 15 data halls on about 435 acres of agricultural land, including a large share of best and most versatile farmland. The planning committee was minded to approve in March 2026, but the council portal still records no decision issued (checked 2026-07-15); we list the site as in planning until the decision notice appears. A recommended condition caps non-domestic water at 20 m³ a day for each business on site, subject to an approved cooling strategy (committee report PA/2025/643); no annual total is published.

Stated size

1,000 MW

biggest size stated for this site Planning

Source: North Lincolnshire Council planning committee report PA/2025/643 (committee report — up to 1 GW / 1,000 MW IT load)

The largest megawatt figure on the public record for this one site (planning docs or operator materials). It may include stages that are not built yet. Not everyday electricity use; the source sits with the number. Stated size is not electricity use.

Site area

435 acres

farmland Planning

What was here: Agricultural fields (former airfield landscape influences); adjacent Elsham Wolds Industrial Estate

Water

Not disclosed

No annual water figure in materials reviewed

Equivalences

No operator on this map discloses expected load factor (the share of peak power used on average), so yearly electricity figures are shown as a range, not as a known total.

Grid connection

On-site energy centre parameter up to ~49.9 MW; electricity substations and undergrounding of overhead lines listed in the outline description. Full grid-connection MW for the campus not itemised as a single figure in sources reviewed. Planning

Claims on record

Disclosure checklist

Plain checklist, no aggregate score.

Right of reply

Right of reply: open; no response received. Email marco@prismaticlabs.ai. Subject is prefilled. Or see methodology.

Timeline

  1. 2025-05: Outline planning application PA/2025/643 submitted
  2. 2026-03-11: North Lincolnshire Council planning committee minded to approve outline permission

Controversies / contested procedure

Permanent loss of over 430 acres of productive farmland raised in objections; land classification records show substantial best and most versatile farmland

Source: PA/2025/643 committee report (representations and ALC sections)

Sources

Planning application PA/2025/643: live portal