The Yorkshire Compute Belt

Sites / Latos Preston Farm (Stockton)

Latos Preston Farm (Stockton)

Latos Data Centres · proposed · Stockton-on-Tees Borough Council

Neural-edge AI data centre of about 9.5 MW IT capacity at Preston Farm Industrial Estate (near Westland Way), Stockton-on-Tees. Operator and local press reported full planning approval in September 2025 for two data halls (~1,750 m²) aiming to open early 2027. Listed as proposed until a live Stockton Public Access case page can be linked.

Stated size

10 MW

biggest size stated for this site Operator

Source: Latos materials describing Stockton Preston Farm IT capacity (up to 9.5 MW)

The largest megawatt figure on the public record for this one site (planning docs or operator materials). It may include stages that are not built yet. Not everyday electricity use; the source sits with the number. Stated size is not electricity use.

Site area

Unknown

active industrial

What was here: Preston Farm Industrial Estate (Westland Way area, Stockton / Thornaby)

Water

Not disclosed

No annual water figure in materials reviewed

Equivalences

No operator on this map discloses expected load factor (the share of peak power used on average), so yearly electricity figures are shown as a range, not as a known total.

Claims on record

None recorded yet.

Disclosure checklist

Plain checklist, no aggregate score.

Right of reply

Right of reply: open; no response received. Email marco@prismaticlabs.ai. Subject is prefilled. Or see methodology.

Timeline

  1. 2025-06: Planning application for Preston Farm neural-edge data centre reported filed (exact Stockton ref still to confirm)
  2. 2025-09: Operator and local press: Stockton Council grants full planning approval; construction aimed later 2025 / operations early 2027 (live portal URL still missing)

Sources

No live planning application link recorded yet. We do not upgrade a site past “proposed” without one.

Map point: longitude -1.33, latitude 54.55. Last reviewed 2026-07-15.