The Yorkshire Compute Belt

Sites / Wilton International data centre (Phase 1)

Wilton International data centre (Phase 1)

Sembcorp Energy UK / Digital Reef · proposed · Redcar and Cleveland Borough Council

Phase 1 campus of up to three air-cooled data halls at Wilton International industrial park, Teesside. Joint development by Sembcorp Energy UK and Digital Reef. Public materials state up to 280 megawatts. Live Redcar portal page is EIA screening R/2026/0183/SC (decision: EIA not required, Apr 2026). Trade press reports a full planning application and May 2026 consultation, but Display R/2026/0183/FF currently redirects to the portal home, so status stays proposed until a resolving full-application URL is linked.

Stated size

280 MW

biggest size stated for this site Operator

Source: Sembcorp Energy UK / Digital Reef Phase 1 Wilton International stated capacity (up to 280 MW); later phases not yet documented here

The largest megawatt figure on the public record for this one site (planning docs or operator materials). It may include stages that are not built yet. Not everyday electricity use; the source sits with the number. Stated size is not electricity use.

Site area

38 acres

active industrial Planning

What was here: Wilton International industrial park (brownfield / industrial)

Water

Not disclosed

No annual water figure in materials reviewed

Equivalences

No operator on this map discloses expected load factor (the share of peak power used on average), so yearly electricity figures are shown as a range, not as a known total.

Grid connection

Press and applicant materials cite existing large grid / private-wire capacity at Wilton and Greystones Substation supply for Phase 1. A single campus grid-connection megawatt figure beyond the 280 MW scheme size is not itemised in sources reviewed. Operator

Cooling

Air-cooled campus stated in application materials reported by the trade press Operator

Claims on record

None recorded yet.

Disclosure checklist

Plain checklist, no aggregate score.

Right of reply

Right of reply: open; no response received. Email marco@prismaticlabs.ai. Subject is prefilled. Or see methodology.

Timeline

  1. 2025-07: Sembcorp reported acquiring the Wilton land parcel (trade press)
  2. 2026-04-01: EIA screening opinion: EIA not required for Wilton data centre / ancillary infrastructure (R/2026/0183/SC)
  3. 2026-05: Sembcorp / Digital Reef announce Phase 1 (up to 280 MW) and state a planning application / consultation is underway (portal full-app Display URL not yet resolving)

Sources

Planning application R/2026/0183/SC: live portal

Map point: longitude -1.145, latitude 54.575. Last reviewed 2026-07-15.