Ada Infrastructure Docklands campus

Ada Infrastructure (GLP Capital Partners) · proposed (reported under construction) · London Borough of Newham

210 MW campus (three 70 MW halls plus multi-function building) on the former Allnex paint factory site, West Silvertown / Royal Docks. Newham approval and reserved-matters progress reported 2024–2025; groundbreaking reported February 2026. Listed as proposed until a lasting Newham Public Access case URL (not only a reference number) is linked.

Stated size

210 MW

biggest size stated for this site Operator

Source: Ada Infrastructure: 210 MW Docklands campus

The largest megawatt figure on the public record for this one site (planning docs or operator materials). It may include stages that are not built yet. Not everyday electricity use; the source sits with the number. Stated size is not electricity use.

Site area

Unknown

ex-industrial / brownfield

What was here: Former Allnex / paint factory, West Silvertown (vacant)

Water

Zero

litres/year · operator claim Operator

Ada Infrastructure (GLP Capital Partners) claims cooling eliminates water use. That is their claim, not a metered reading.

Equivalences

No operator on this map discloses expected load factor (the share of peak power used on average), so yearly electricity figures are shown as a range, not as a known total.

Cooling

Air and liquid cooling without water evaporation; district-heat interconnection provisions stated Operator

Claims on record

None recorded yet.

Disclosure checklist

Plain checklist, no aggregate score.

Right of reply

Right of reply: open; no response received. Email marco@prismaticlabs.ai. Subject is prefilled. Or see methodology.

Timeline

  1. 2024-06: Resolution to grant / approval for Docklands campus reported (Newham Strategic Development Committee)
  2. 2024-12: Reserved matters / detailed permissions progress reported; RMA 24/02660/REM cited for multi-function building
  3. 2026-02-26: Groundbreaking reported for first 70 MW building

Sources

Planning application reference on record: 24/02660/REM. Link to the live council page not yet verified.

Map point: longitude 0.01725, latitude 51.50328. Last reviewed 2026-07-20.