Skip to content
The London Compute Ring

Research

Evidence-protocol status for every mapped site, generated from the live dataset (so it never drifts from the map). Rows without a resolving planning URL are listed first — that is the outstanding work. This is not a census of every rack in London; see what we include.

Site checklist

✓ the site's evidence resolves (a planning application or decision URL, or an operator/third-party record for operating and closed sites); ○ it still needs a resolving source. Largest schemes first.

Status Site Ref Portal Stated size Notes
○ outstanding Digital Reef 'London Data Freeport' (East Havering) — No lasting portal URL yet 600 MW · biggest size stated for this site Held at proposed until a lasting portal URL is linked.
○ outstanding Equinix Hertfordshire Campus (South Mimms) — No lasting portal URL yet 250 MW · biggest size stated for this site Reported consented; held at proposed until a lasting portal URL is linked.
○ outstanding Ada Infrastructure Docklands campus 24/02660/REM Reference only; no lasting URL 210 MW · biggest size stated for this site Reported under construction; held at proposed until a lasting portal URL is linked.
○ outstanding Ark Elstree campus (former Mercure Hotel) — No lasting portal URL yet 200 MW · biggest size stated for this site Held at proposed until a lasting portal URL is linked.
✓ sourced CorScale Iver (Court Lane) 3337981 GOV.UK 103 MW · biggest size stated for this site Approved; application linked.
✓ sourced Yondr London campus (Slough) — — 100 MW · biggest size stated for this site Operating; evidenced by an operator or third-party source.
○ outstanding Colt DCS Hayes Digital Park (expansion) — No lasting portal URL yet 97 MW · biggest size stated for this site Reported consented; held at proposed until a lasting portal URL is linked.
✓ sourced Abbots Langley data centre (Bedmond Road) 3346061 GOV.UK 96 MW · biggest size stated for this site Approved; application linked.
○ outstanding CyrusOne LON6 (Iver Heath) — No lasting portal URL yet 90 MW · biggest size stated for this site Reported consented; held at proposed until a lasting portal URL is linked.
✓ sourced Manor Farm data centre (Poyle Road) 3366043 GOV.UK 72 MW · biggest size stated for this site Approved; application linked.
○ outstanding Pure DC Brent Cross (LON01, Building 2) — No lasting portal URL yet 70 MW · IT equipment only Reported under construction; held at proposed until a lasting portal URL is linked.
✓ sourced Colt DCS Hayes Digital Park (existing campus) — — 63 MW · biggest size stated for this site Operating; evidenced by an operator or third-party source.
○ outstanding Pure DC / SEGRO Premier Park (Park Royal) — No lasting portal URL yet 56 MW · biggest size stated for this site Reported consented; held at proposed until a lasting portal URL is linked.
✓ sourced Vantage London I (LHR1, PowerGate) — — 55 MW · biggest size stated for this site Operating; evidenced by an operator or third-party source.
✓ sourced Global Switch London East — — 45 MW · biggest size stated for this site Operating; evidenced by an operator or third-party source.
✓ sourced GTR GB One (Slough) — — 40.5 MW · biggest size stated for this site Operating; evidenced by an operator or third-party source.
○ outstanding Global Switch London South — No lasting portal URL yet 40 MW · biggest size stated for this site Reported consented; held at proposed until a lasting portal URL is linked.
○ outstanding Kao Data KLON-04 (Harlow) — No lasting portal URL yet 36 MW · biggest size stated for this site Held at proposed until a lasting portal URL is linked.
○ outstanding Telehouse West Two (Docklands) — No lasting portal URL yet 33 MW · biggest size stated for this site Reported under construction; held at proposed until a lasting portal URL is linked.
✓ sourced VIRTUS LONDON19 (Slough) — — 32.5 MW · biggest size stated for this site Operating; evidenced by an operator or third-party source.
✓ sourced NTT London 1 (Dagenham) — — 32 MW · first stage only Operating; evidenced by an operator or third-party source.
○ outstanding Equinix LD14 (Slough) — No lasting portal URL yet 30 MW · biggest size stated for this site Reported under construction; held at proposed until a lasting portal URL is linked.
✓ sourced VIRTUS LONDON7 (Stockley Park) — — 28 MW · biggest size stated for this site Operating; evidenced by an operator or third-party source.
✓ sourced Iron Mountain LON-2 (Slough) — — 27 MW · biggest size stated for this site Operating; evidenced by an operator or third-party source.
✓ sourced VIRTUS LONDON4 (Slough) — — 27 MW · biggest size stated for this site Operating; evidenced by an operator or third-party source.
✓ sourced Equinix LD5 (Slough) — — 25 MW · biggest size stated for this site Operating; evidenced by an operator or third-party source.
○ outstanding Iron Mountain LON-3 (Slough) — No lasting portal URL yet 25 MW · biggest size stated for this site Reported under construction; held at proposed until a lasting portal URL is linked.
✓ sourced VIRTUS LONDON5 (Stockley Park) — — 24 MW · biggest size stated for this site Operating; evidenced by an operator or third-party source.
✓ sourced VIRTUS LONDON9 (Slough) — — 24 MW · biggest size stated for this site Operating; evidenced by an operator or third-party source.
✓ sourced VIRTUS LONDON14 (Stockley Park) — — 22 MW · biggest size stated for this site Operating; evidenced by an operator or third-party source.
✓ sourced VIRTUS LONDON12 (Slough) — — 21 MW · biggest size stated for this site Operating; evidenced by an operator or third-party source.
✓ sourced NTT Hemel Hempstead 3 (HH3) — — 20 MW · biggest size stated for this site Operating; evidenced by an operator or third-party source.
✓ sourced Pure DC Brent Cross (LON01, Building 1) — — 20 MW · IT equipment only Operating; evidenced by an operator or third-party source.
✓ sourced Vantage London II (LHR2, Park Royal) — — 20 MW · biggest size stated for this site Operating; evidenced by an operator or third-party source.
✓ sourced CyrusOne LON4 (Slough) — — 18 MW · biggest size stated for this site Operating; evidenced by an operator or third-party source.
✓ sourced CyrusOne LON5 (Slough) — — 18 MW · biggest size stated for this site Operating; evidenced by an operator or third-party source.
✓ sourced Digital Realty LGW15 (Crawley Unit 1) (beyond M25) — — 18 MW · biggest size stated for this site Operating; evidenced by an operator or third-party source.
✓ sourced Global Switch London North — — 18 MW · biggest size stated for this site Operating; evidenced by an operator or third-party source.
✓ sourced Telehouse South (Blackwall Yard) — — 18 MW · biggest size stated for this site Operating; evidenced by an operator or third-party source.
✓ sourced VIRTUS LONDON8 (Stockley Park) — — 18 MW · biggest size stated for this site Operating; evidenced by an operator or third-party source.
○ outstanding Kao Data KLON-03 (Harlow) — No lasting portal URL yet 17.6 MW · biggest size stated for this site Reported under construction; held at proposed until a lasting portal URL is linked.
✓ sourced Digital Realty LGW16 (Crawley Unit 2) (beyond M25) — — 16 MW · biggest size stated for this site Operating; evidenced by an operator or third-party source.
✓ sourced Equinix LD4 (Slough) — — 16 MW · biggest size stated for this site Operating; evidenced by an operator or third-party source.
✓ sourced Equinix LD6 (Slough) — — 16 MW · biggest size stated for this site Operating; evidenced by an operator or third-party source.
✓ sourced Telehouse North Two (Docklands) — — 16 MW · biggest size stated for this site Operating; evidenced by an operator or third-party source.
✓ sourced VIRTUS LONDON6 (Stockley Park) — — 16 MW · biggest size stated for this site Operating; evidenced by an operator or third-party source.
✓ sourced CyrusOne LON2 (West Drayton) — — 13.9 MW · biggest size stated for this site Operating; evidenced by an operator or third-party source.
✓ sourced VIRTUS LONDON11 (Slough) — — 13 MW · biggest size stated for this site Operating; evidenced by an operator or third-party source.
✓ sourced NTT Hemel Hempstead 4 (HH4) — — 12 MW · biggest size stated for this site Operating; evidenced by an operator or third-party source.
✓ sourced Serverfarm LON1 (Feltham) — — 11.4 MW · biggest size stated for this site Operating; evidenced by an operator or third-party source.
✓ sourced VIRTUS LONDON2 (Hayes) — — 11.4 MW · biggest size stated for this site Operating; evidenced by an operator or third-party source.
✓ sourced CyrusOne LON3 (Slough) — — 9 MW · biggest size stated for this site Operating; evidenced by an operator or third-party source.
✓ sourced Equinix LD10 (Slough) — — 9 MW · biggest size stated for this site Operating; evidenced by an operator or third-party source.
✓ sourced Equinix LD13x (Slough) — — 9 MW · biggest size stated for this site Operating; evidenced by an operator or third-party source.
✓ sourced Kao Data KLON-01 (Harlow) — — 8.8 MW · biggest size stated for this site Operating; evidenced by an operator or third-party source.
✓ sourced Kao Data KLON-02 (Harlow) — — 8.8 MW · biggest size stated for this site Operating; evidenced by an operator or third-party source.
✓ sourced CyrusOne LON1 (Slough) — — 8.7 MW · biggest size stated for this site Operating; evidenced by an operator or third-party source.
✓ sourced Iron Mountain LON-1 (Slough) — — 8.7 MW · biggest size stated for this site Operating; evidenced by an operator or third-party source.
✓ sourced Digital Realty LON1 (Hanbury Street) — — 8 MW · biggest size stated for this site Operating; evidenced by an operator or third-party source.
✓ sourced VIRTUS LONDON3 (Slough) — — 7.2 MW · biggest size stated for this site Operating; evidenced by an operator or third-party source.
✓ sourced VIRTUS LONDON10 (Slough) — — 6.6 MW · biggest size stated for this site Operating; evidenced by an operator or third-party source.
✓ sourced NTT Hemel Hempstead 2 (HH2) — — 6.2 MW · biggest size stated for this site Operating; evidenced by an operator or third-party source.
✓ sourced VIRTUS LONDON1 (Enfield) — — 4.2 MW · biggest size stated for this site Operating; evidenced by an operator or third-party source.
✓ sourced Truman Brewery data centre (Grey Eagle Street) PA/24/01450 GOV.UK 4 MW · biggest size stated for this site Approved; application linked.
✓ sourced NTT Slough 3 (SL3) — — 2.7 MW · biggest size stated for this site Operating; evidenced by an operator or third-party source.
✓ sourced Digital Realty Oliver's Yard (LHR18) — — 2.3 MW · biggest size stated for this site Operating; evidenced by an operator or third-party source.
✓ sourced NTT Hemel Hempstead 1 (HH1) — — 2 MW · biggest size stated for this site Operating; evidenced by an operator or third-party source.
✓ sourced NTT Slough 2 (SL2) — — 1.8 MW · biggest size stated for this site Operating; evidenced by an operator or third-party source.
✓ sourced Pulsant Croydon LN-1 — — 1.4 MW · biggest size stated for this site Operating; evidenced by an operator or third-party source.
✓ sourced Netwise London Central (Bermondsey) — — 0.5 MW · biggest size stated for this site Decommissioned; evidenced by an operator or third-party source.
✓ sourced Bidder Street data centre (Canning Town) 24/00088/FUL GOV.UK Not disclosed In planning; application linked. Megawatts not yet extracted.
✓ sourced CyrusOne LON7 / Honey Monster site (Southall) 253874FUL GOV.UK Not disclosed In planning; application linked. Megawatts not yet extracted.
✓ sourced Digital Realty Docklands (Harbour Exchange) — — Not disclosed Operating; evidenced by an operator or third-party source. Megawatts not yet extracted.
✓ sourced Digital Realty LGW14 (Woking) (beyond M25) — — Not disclosed Operating; evidenced by an operator or third-party source. Megawatts not yet extracted.
✓ sourced Digital Realty Slough campus — — Not disclosed Operating; evidenced by an operator or third-party source. Megawatts not yet extracted.
✓ sourced Equinix LD11x (Slough) — — Not disclosed Operating; evidenced by an operator or third-party source. Megawatts not yet extracted.
✓ sourced Equinix LD7 (Slough) — — Not disclosed Operating; evidenced by an operator or third-party source. Megawatts not yet extracted.
✓ sourced Equinix LD8 (Harbour Exchange) — — Not disclosed Operating; evidenced by an operator or third-party source. Megawatts not yet extracted.
✓ sourced Equinix LD9 (Powergate) — — Not disclosed Operating; evidenced by an operator or third-party source. Megawatts not yet extracted.
○ outstanding Equinix Wexham Road (former AkzoNobel paint factory) P/00072/152 Reference only; no lasting URL Not disclosed Reported consented; held at proposed until a lasting portal URL is linked. Megawatts not yet extracted.
✓ sourced Google Waltham Cross data centre — — Not disclosed Operating; evidenced by an operator or third-party source. Megawatts not yet extracted.
✓ sourced Greystoke Woodlands Park data centre (Iver) 3347353 GOV.UK Not disclosed Approved; application linked. Megawatts not yet extracted.
○ outstanding Microsoft Park Royal data centre — No lasting portal URL yet Not disclosed Reported under construction; held at proposed until a lasting portal URL is linked. Megawatts not yet extracted.
○ outstanding SEGRO Iver (Thorney Business Park) — No lasting portal URL yet Not disclosed Reported consented; held at proposed until a lasting portal URL is linked. Megawatts not yet extracted.
✓ sourced Telehouse East (Docklands) — — Not disclosed Operating; evidenced by an operator or third-party source. Megawatts not yet extracted.
✓ sourced Telehouse North (Docklands) — — Not disclosed Operating; evidenced by an operator or third-party source. Megawatts not yet extracted.
✓ sourced Telehouse West (Docklands) — — Not disclosed Operating; evidenced by an operator or third-party source. Megawatts not yet extracted.
✓ sourced Thurrock data centre (Arena Essex) 25/00573/OUT GOV.UK Not disclosed In planning; application linked. Megawatts not yet extracted.

Not yet on the map

Outstanding before we treat figures as fully checked

  1. Save an archived copy of every source link when we add it.
  2. Find lasting council planning pages for Yondr, Pure Premier Park, Ada Docklands, and Truman Grey Eagle, then update statuses where that allows.
  3. Cite exact pages inside planning PDFs and SoS inspector reports.
  4. Check map pins against the official site-boundary drawings in each application.
  5. Confirm DESNZ local-authority electricity totals against the latest stacked CSV.

Sample information requests

Copy, personalise, and send via each body’s published channel. These are starting points, not legal advice.

Newham · Ada Docklands deep-link

[Your name]
[Date]

Information Governance
London Borough of Newham
[published FOI/EIR email or portal]

Dear Sir/Madam,

Freedom of Information Act 2000 / Environmental Information Regulations 2004

I request information about planning application 24/02660/REM and any related hybrid / outline applications for the Ada Infrastructure Docklands data centre campus (former Allnex / paint factory site, West Silvertown).

Please provide:

1. The lasting public URL (or Idox system keyVal) that opens each related application’s live case page on Public Access, not only a search form.

2. Decision notices and committee reports for the hybrid consent and reserved matters, with titles and dates.

3. Any Environmental Statement chapters or energy statements that state megawatt capacity, grid connection size, water demand, or cooling method.

I am happy to receive the response electronically. If the cost limit applies, please advise how to refine the request. This is for a public-interest project assembling sourced environmental figures for regional data centre proposals (The London Compute Ring).

Yours faithfully,
[Name]
[Email]

Thames Water · water capacity and zero-water claims

[Your name]
[Date]

Thames Water
[published EIR address]

Dear Sir/Madam,

Environmental Information Regulations 2004: request for information

I am requesting environmental information about water supply and wastewater impacts of proposed and consented data centre developments in Greater London and the M25 fringe.

Please treat this as a request under the Environmental Information Regulations 2004.

For the period 1 January 2020 to the date of your response, please provide:

1. Any assessments, capacity studies, network constraint notes, or correspondence assessing the impact on public water supply or sewerage/wastewater capacity of data centre developments at or near:
   a) Manor Farm / Poyle Road, Slough (appeal ref 3366043);
   b) Yondr campus, Slough;
   c) Premier Park / Park Royal (Pure DC / SEGRO);
   d) Ada Docklands / West Silvertown, Newham;
   e) Bidder Street, Canning Town (24/00088/FUL);
   f) Grey Eagle Street / Truman Brewery, Tower Hamlets (PA/24/01450).

2. For each of the above where held: stated or estimated annual or peak water demand, whether supply is potable / non-potable / private, and any discharge consent volumes or temperatures relevant to cooling.

3. Any documents in which an operator claimed “zero water use”, “eliminates water usage”, or closed-loop / no potable offtake for a data centre in your area, and Thames Water’s recorded view on that claim.

I am happy to receive information electronically. If any part exceeds the cost limit or engages an exception, please advise what can be disclosed within the limit.

This information is sought for a public-interest project assembling sourced environmental figures for data centre proposals in the region (The London Compute Ring). I do not seek personal data of individuals.

Yours faithfully,
[Name]
[Email]

Full research log also lives in the repo as RESEARCH.md for contributors.