Skip to content
The London Compute Ring

Sites / Iron Mountain LON-3 (Slough)

Iron Mountain LON-3 (Slough)

Iron Mountain Data Centers · proposed (reported under construction) · Slough Borough Council

Iron Mountain LON-3 on Buckingham Avenue, marketed as in development with expected completion in 2026. Operator pages state about 25 MW capacity and 5,220 m². Held at proposed until a lasting planning portal URL is linked.

Stated size

25 MW

biggest size stated for this site Operator

Source: Iron Mountain: 25 MW at LON-3

The largest megawatt figure on the public record for this one site (planning docs or operator materials). It may include stages that are not built yet. Not everyday electricity use; the source sits with the number. Stated size is not electricity use.

Site area

Unknown

active industrial

What was here: Slough Trading Estate industrial plot

Water

Not disclosed

No annual water figure in materials reviewed

Equivalences

No operator on this map discloses expected load factor (the share of peak power used on average), so yearly electricity figures are shown as a range, not as a known total.

Claims on record

None recorded yet.

Disclosure checklist

Plain checklist, no aggregate score.

Right of reply

Right of reply: open; no response received. Email marco@prismaticlabs.ai. Subject is prefilled. Or see methodology.

Timeline

  1. 2026: Operator expects LON-3 completion in 2026

Sources

No live planning application link recorded yet. We do not upgrade a site past “proposed” without one.

Map point: longitude -0.6327, latitude 51.5272. Last reviewed 2026-07-20.