Skip to content

The London Compute Ring: a map of data centre sites across Greater London and the M25 fringe

The London Compute Ring

AI and cloud leave a physical footprint: power, land, and water. This map plots the data centres across Greater London and the M25 fringe, and puts those figures where communities can see them.

≈980 MW operating · ≈2,030 MW building, consented or proposed

Show areas

Tap an area to hide it.

5 of 5 areas shown

Jump to

How to read the circles

Colour = planning status

  • Proposed
  • In planning
  • Approved
  • Building
  • Operating
  • Decommissioned

Outline = size disclosed

  • Solid fill: megawatts published
  • Dashed: megawatts not disclosed (sized by site area, or location only if area unknown)

Grey demos above are style only, not a status colour. Numbered dark circles group nearby sites: click to frame the next split of that group.

Size = stated megawatts when known

5 MW
100 MW
500 MW

Regional footprint

87 sites · ≥3,010 megawatts disclosed · 854 acres of land take · 18 with power not disclosed · 3 campus dossiers folded into their halls (not pinned or summed, to avoid double-counting) · 1 closed (shown on the map, not in totals) . The “at least” symbol (≥) marks incomplete disclosure. Megawatts are stated size on paper (nameplate/contracted), not day-to-day regional electricity use. Site figures last reviewed between 2026-07-20 and 2026-10-05.

How you might use this

Three ways in. Each link goes to a tool already on the site.

Journalists

Check a scheme behind a story: every figure is sourced or blank, with the planning reference and objection window.

Research checklist · Download GeoJSON

Residents

See what’s proposed or running near you, and how to have your say.

Near you · Have your say

Researchers

Open, sourced data. Download the GeoJSON and read how figures are chosen.

Download GeoJSON · Methodology

Context

Power, water, jobs, noise, and land, and how London compares with the US build-out.

A sourced explainer of the pressures these sites put on grids and communities, with mitigations already appearing in London dossiers. Benefits sit next to costs.

Read the context →

Site Status Stated size Site area
Manor Farm data centre (Poyle Road) approved 72 MW · biggest size stated for this site 20 acres · farmland
Yondr London campus (Slough) operating 100 MW · biggest size stated for this site Unknown · brownfield
Pure DC / SEGRO Premier Park (Park Royal) proposed (reported consented) 56 MW · biggest size stated for this site 10 acres · industrial
Ada Infrastructure Docklands campus proposed (reported under construction) 210 MW · biggest size stated for this site Unknown · brownfield
Bidder Street data centre (Canning Town) in planning Not disclosed Unknown · brownfield
Truman Brewery data centre (Grey Eagle Street) approved 4 MW · biggest size stated for this site Unknown · brownfield
VIRTUS LONDON4 (Slough) operating 27 MW · biggest size stated for this site Unknown · industrial
CyrusOne LON1 (Slough) operating 8.7 MW · biggest size stated for this site Unknown · industrial
NTT London 1 (Dagenham) operating 32 MW · first stage only Unknown · industrial
Global Switch London East operating 45 MW · biggest size stated for this site Unknown · industrial
Global Switch London North operating 18 MW · biggest size stated for this site Unknown · industrial
Vantage London II (LHR2, Park Royal) operating 20 MW · biggest size stated for this site Unknown · industrial
Digital Realty Slough campus operating Not disclosed Unknown · industrial
Telehouse North Two (Docklands) operating 16 MW · biggest size stated for this site Unknown · industrial
VIRTUS LONDON5 (Stockley Park) operating 24 MW · biggest size stated for this site Unknown · industrial
Vantage London I (LHR1, PowerGate) operating 55 MW · biggest size stated for this site 5 acres · industrial
Iron Mountain LON-1 (Slough) operating 8.7 MW · biggest size stated for this site Unknown · industrial
Iron Mountain LON-2 (Slough) operating 27 MW · biggest size stated for this site Unknown · industrial
Iron Mountain LON-3 (Slough) proposed (reported under construction) 25 MW · biggest size stated for this site Unknown · industrial
VIRTUS LONDON3 (Slough) operating 7.2 MW · biggest size stated for this site Unknown · industrial
VIRTUS LONDON9 (Slough) operating 24 MW · biggest size stated for this site Unknown · industrial
VIRTUS LONDON10 (Slough) operating 6.6 MW · biggest size stated for this site Unknown · industrial
VIRTUS LONDON11 (Slough) operating 13 MW · biggest size stated for this site Unknown · industrial
VIRTUS LONDON12 (Slough) operating 21 MW · biggest size stated for this site Unknown · industrial
VIRTUS LONDON19 (Slough) operating 32.5 MW · biggest size stated for this site Unknown · industrial
VIRTUS LONDON2 (Hayes) operating 11.4 MW · biggest size stated for this site Unknown · industrial
VIRTUS LONDON1 (Enfield) operating 4.2 MW · biggest size stated for this site Unknown · industrial
VIRTUS LONDON6 (Stockley Park) operating 16 MW · biggest size stated for this site Unknown · industrial
VIRTUS LONDON7 (Stockley Park) operating 28 MW · biggest size stated for this site Unknown · industrial
VIRTUS LONDON8 (Stockley Park) operating 18 MW · biggest size stated for this site Unknown · industrial
NTT Slough 2 (SL2) operating 1.8 MW · biggest size stated for this site Unknown · industrial
Equinix LD8 (Harbour Exchange) operating Not disclosed Unknown · industrial
Equinix LD9 (Powergate) operating Not disclosed Unknown · industrial
Telehouse West (Docklands) operating Not disclosed Unknown · industrial
Telehouse West Two (Docklands) proposed (reported under construction) 33 MW · biggest size stated for this site Unknown · industrial
Telehouse South (Blackwall Yard) operating 18 MW · biggest size stated for this site Unknown · industrial
Serverfarm LON1 (Feltham) operating 11.4 MW · biggest size stated for this site Unknown · industrial
Digital Realty Docklands (Harbour Exchange) operating Not disclosed Unknown · industrial
Abbots Langley data centre (Bedmond Road) approved 96 MW · biggest size stated for this site 77 acres · farmland
NTT Hemel Hempstead 1 (HH1) operating 2 MW · biggest size stated for this site Unknown · industrial
NTT Hemel Hempstead 2 (HH2) operating 6.2 MW · biggest size stated for this site Unknown · industrial
NTT Hemel Hempstead 3 (HH3) operating 20 MW · biggest size stated for this site Unknown · industrial
NTT Hemel Hempstead 4 (HH4) operating 12 MW · biggest size stated for this site Unknown · industrial
Ark Elstree campus (former Mercure Hotel) proposed 200 MW · biggest size stated for this site Unknown · brownfield
Pulsant Croydon LN-1 operating 1.4 MW · biggest size stated for this site Unknown · industrial
Thurrock data centre (Arena Essex) in planning Not disclosed 128 acres · brownfield
Digital Realty Oliver's Yard (LHR18) operating 2.3 MW · biggest size stated for this site Unknown · industrial
CorScale Iver (Court Lane) approved 103 MW · biggest size stated for this site 14 acres · brownfield
CyrusOne LON6 (Iver Heath) proposed (reported consented) 90 MW · biggest size stated for this site Unknown · industrial
SEGRO Iver (Thorney Business Park) proposed (reported consented) Not disclosed 20 acres · brownfield
Digital Realty LGW15 (Crawley Unit 1) operating 18 MW · biggest size stated for this site Unknown · industrial
Digital Realty LGW16 (Crawley Unit 2) operating 16 MW · biggest size stated for this site Unknown · industrial
Equinix LD4 (Slough) operating 16 MW · biggest size stated for this site Unknown · industrial
Equinix LD5 (Slough) operating 25 MW · biggest size stated for this site Unknown · industrial
Equinix LD6 (Slough) operating 16 MW · biggest size stated for this site Unknown · industrial
GTR GB One (Slough) operating 40.5 MW · biggest size stated for this site Unknown · industrial
Digital Realty LON1 (Hanbury Street) operating 8 MW · biggest size stated for this site Unknown · industrial
CyrusOne LON2 (West Drayton) operating 13.9 MW · biggest size stated for this site Unknown · industrial
CyrusOne LON3 (Slough) operating 9 MW · biggest size stated for this site Unknown · industrial
CyrusOne LON4 (Slough) operating 18 MW · biggest size stated for this site Unknown · industrial
CyrusOne LON5 (Slough) operating 18 MW · biggest size stated for this site Unknown · industrial
VIRTUS LONDON14 (Stockley Park) operating 22 MW · biggest size stated for this site Unknown · industrial
Equinix LD7 (Slough) operating Not disclosed Unknown · industrial
Equinix LD10 (Slough) operating 9 MW · biggest size stated for this site Unknown · industrial
Equinix LD13x (Slough) operating 9 MW · biggest size stated for this site Unknown · industrial
Telehouse East (Docklands) operating Not disclosed Unknown · industrial
NTT Slough 3 (SL3) operating 2.7 MW · biggest size stated for this site Unknown · industrial
Kao Data KLON-01 (Harlow) operating 8.8 MW · biggest size stated for this site Unknown · industrial
Kao Data KLON-02 (Harlow) operating 8.8 MW · biggest size stated for this site Unknown · industrial
Kao Data KLON-03 (Harlow) proposed (reported under construction) 17.6 MW · biggest size stated for this site Unknown · industrial
Kao Data KLON-04 (Harlow) proposed 36 MW · biggest size stated for this site Unknown · industrial
Digital Realty LGW14 (Woking) operating Not disclosed Unknown · industrial
Google Waltham Cross data centre operating Not disclosed 33 acres · farmland
Equinix Hertfordshire Campus (South Mimms) proposed (reported consented) 250 MW · biggest size stated for this site 85 acres · farmland
Digital Reef 'London Data Freeport' (East Havering) proposed 600 MW · biggest size stated for this site 432 acres · farmland
Colt DCS Hayes Digital Park (existing campus) operating 63 MW · biggest size stated for this site Unknown · industrial
Colt DCS Hayes Digital Park (expansion) proposed (reported consented) 97 MW · biggest size stated for this site Unknown · industrial
Microsoft Park Royal data centre proposed (reported under construction) Not disclosed Unknown · industrial
Netwise London Central (Bermondsey) decommissioned 0.5 MW · biggest size stated for this site Unknown · industrial
Global Switch London South proposed (reported consented) 40 MW · biggest size stated for this site Unknown · industrial
CyrusOne LON7 / Honey Monster site (Southall) in planning Not disclosed 17 acres · brownfield
Equinix Wexham Road (former AkzoNobel paint factory) proposed (reported consented) Not disclosed 12 acres · brownfield
Pure DC Brent Cross (LON01, Building 1) operating 20 MW · IT equipment only Unknown · brownfield
Pure DC Brent Cross (LON01, Building 2) proposed (reported under construction) 70 MW · IT equipment only Unknown · brownfield
Greystoke Woodlands Park data centre (Iver) approved Not disclosed Unknown · brownfield
Telehouse North (Docklands) operating Not disclosed Unknown · industrial
Equinix LD11x (Slough) operating Not disclosed Unknown · industrial
Equinix LD14 (Slough) proposed (reported under construction) 30 MW · biggest size stated for this site 2 acres · industrial

Full sortable table Compare view Context Research log Methodology