The London Compute Ring

Sites / NTT London 1 (Dagenham)

NTT London 1 (Dagenham)

NTT Global Data Centers · operating · London Borough of Barking and Dagenham

Carrier-neutral campus at Yew Tree Avenue, Dagenham. Operator states 32 MW critical IT load in the first building, rising to 64 MW once fully built out, with an on-site substation delivering 80 MVA. Only the 32 MW operating today is counted; the further 32 MW has no published timetable or planning reference. Mapped as operating from operator records; no council planning-application URL is linked.

Stated size

32 MW

first stage only Operator

Source: NTT London 1 first building IT load

Power size for the first stage of construction only. They may seek more later. Stated size is not electricity use.

Site area

Unknown

active industrial

What was here: Dagenham industrial / campus land

Water

Not disclosed

No annual water figure in materials reviewed

Equivalences

No operator on this map discloses expected load factor (the share of peak power used on average), so yearly electricity figures are shown as a range, not as a known total.

Claims on record

None recorded yet.

Disclosure checklist

Plain checklist, no aggregate score.

Right of reply

Right of reply: open; no response received. Email marco@prismaticlabs.ai. Subject is prefilled. Or see methodology.

Sources

No live planning application link recorded yet. We do not upgrade a site past “proposed” without one.

Map point: longitude 0.155, latitude 51.555. Last reviewed 2026-10-05.