Undisclosed (application on former EMR site) · in planning · London Borough of Newham

Full application for a data centre (Use Class B8) with plant building and energy centre on the former EMR site, Bidder Street, Canning Town. Accompanied by an Environmental Statement. Megawatt capacity not extracted from documents reviewed so far; pin is approximate pending red-line check.

Stated size

Not disclosed

No megawatt figure in materials reviewed

Operators often omit a megawatt figure. Map circles then use site area instead. Stated size is not electricity use.

Site area

Unknown

ex-industrial / brownfield

What was here: Former EMR site, Bidder Street, Canning Town

Water

Not disclosed

No annual water figure in materials reviewed

Equivalences

No operator on this map discloses expected load factor (the share of peak power used on average), so yearly electricity figures are shown as a range, not as a known total.

Grid connection

Energy centre included in the application description. Campus megawatt figure not yet recorded here. Planning

Claims on record

None recorded yet.

Disclosure checklist

Plain checklist, no aggregate score.

Right of reply

Right of reply: open; no response received. Email marco@prismaticlabs.ai. Subject is prefilled. Or see methodology.

Timeline

  1. 2024-01: Application 24/00088/FUL registered on Newham Public Access (documents dated mid-January 2024)

Sources

Planning application 24/00088/FUL: live portal

Map point: longitude 0.012, latitude 51.518. Last reviewed 2026-07-20.