Sites / Colt DCS Hayes Digital Park (existing campus)

Colt DCS Hayes Digital Park (existing campus)

Colt Data Centre Services · operating · London Borough of Hillingdon

Colt DCS's existing Hayes Digital Park data centres. Colt says its approved expansion adds 97 MW and takes the campus to about 160 MW, which puts today's IT power at about 63 MW; that figure is derived from the two operator numbers, not published on its own. Mapped as operating from operator records; pin nudged from the expansion.

Stated size

63 MW

biggest size stated for this site Operator

Source: Colt DCS: expansion adds 97MW, taking the campus to about 160MW, so about 63MW of IT power exists today (derived from the two operator figures)

The largest megawatt figure on the public record for this one site (planning docs or operator materials). It may include stages that are not built yet. Not everyday electricity use; the source sits with the number. Stated size is not electricity use.

Site area

Unknown

active industrial

What was here: Hayes industrial / existing Colt data-centre campus

Water

Not disclosed

No annual water figure in materials reviewed

Equivalences

No operator on this map discloses expected load factor (the share of peak power used on average), so yearly electricity figures are shown as a range, not as a known total.

Claims on record

None recorded yet.

Disclosure checklist

Plain checklist, no aggregate score.

Right of reply

Right of reply: open; no response received. Email marco@prismaticlabs.ai. Subject is prefilled. Or see methodology.

Sources

No live planning application link recorded yet. We do not upgrade a site past “proposed” without one.

Map point: longitude -0.4216, latitude 51.5084. Last reviewed 2026-10-05.