Sites / Telehouse West Two (Docklands)

Telehouse West Two (Docklands)

Telehouse (KDDI) · proposed (reported under construction) · London Borough of Tower Hamlets

Part of the Telehouse Docklands campus.

Telehouse West Two on the Docklands campus. Operator October 2025 announcement: groundbreaking on a £275m hall, completion targeted for 2028, overall building capacity of 33 MW (up to 4.4 MW per floor). Held at proposed until a lasting planning portal URL is linked (not upgraded to under construction without that URL).

Stated size

33 MW

biggest size stated for this site Operator

Source: Telehouse West Two: 33 MW building capacity

The largest megawatt figure on the public record for this one site (planning docs or operator materials). It may include stages that are not built yet. Not everyday electricity use; the source sits with the number. Stated size is not electricity use.

Site area

Unknown

active industrial

What was here: Docklands campus expansion plot

Water

Not disclosed

No annual water figure in materials reviewed

Equivalences

No operator on this map discloses expected load factor (the share of peak power used on average), so yearly electricity figures are shown as a range, not as a known total.

Claims on record

None recorded yet.

Disclosure checklist

Plain checklist, no aggregate score.

Right of reply

Right of reply: open; no response received. Email marco@prismaticlabs.ai. Subject is prefilled. Or see methodology.

Timeline

  1. 2025-10: Operator announces groundbreaking; completion targeted for 2028

Sources

No live planning application link recorded yet. We do not upgrade a site past “proposed” without one.

Map point: longitude -0.0025, latitude 51.51085. Last reviewed 2026-07-20.