Sites / Microsoft Park Royal data centre
Microsoft Park Royal data centre
Microsoft (Azure) · proposed (reported under construction) · London Borough of Ealing
Microsoft's Park Royal data centre in West London, developed with Goodman (contractor Mace). Microsoft says planning permission was granted in December 2020 and construction began in 2023. No megawatt figure appears in the sources reviewed. Distinct from the neighbouring Pure DC / SEGRO Premier Park scheme. Held at proposed until a lasting planning portal URL is linked; location pin is approximate.
Stated size
Not disclosed
No megawatt figure in materials reviewed
Operators often omit a megawatt figure. Map circles then use site area instead. Stated size is not electricity use.
Site area
Unknown
active industrial
What was here: Park Royal industrial
Water
Not disclosed
No annual water figure in materials reviewed
Equivalences
No operator on this map discloses expected load factor (the share of peak power used on average), so yearly electricity figures are shown as a range, not as a known total.
- Water: Water use: not disclosed
Claims on record
None recorded yet.
Disclosure checklist
- Stated size (MW): not disclosed
- Water: not disclosed
- Power usage effectiveness (PUE): not disclosed
- Energy source claim: none on record
- Load factor: not disclosed
Plain checklist, no aggregate score.
Right of reply
Right of reply: open; no response received. Email marco@prismaticlabs.ai. Subject is prefilled. Or see methodology.
Timeline
- 2020-12: Microsoft and developer Goodman receive planning permission for the Park Royal data centre
- 2023: Construction begins (Microsoft: first half of 2023; site set-up six months, building 24 months)
Sources
No live planning application link recorded yet. We do not upgrade a site past “proposed” without one.
Map point: longitude -0.268, latitude 51.533. Last reviewed 2026-10-05.