VIRTUS LONDON1 (Enfield)

VIRTUS Data Centres (STT GDC) · operating · London Borough of Enfield

VIRTUS LONDON1 at Enfield on the north London / M25 fringe. Operator states over 2,900 m² net technical space and 4.2 MW of IT load. Mapped as operating from operator or third-party records; no council planning-application URL is linked.

Stated size

4 MW

biggest size stated for this site Operator

Source: VIRTUS LONDON1: 4.2 MW IT load

The largest megawatt figure on the public record for this one site (planning docs or operator materials). It may include stages that are not built yet. Not everyday electricity use; the source sits with the number. Stated size is not electricity use.

Site area

Unknown

active industrial

What was here: North London industrial setting

Water

Not disclosed

No annual water figure in materials reviewed

Equivalences

No operator on this map discloses expected load factor (the share of peak power used on average), so yearly electricity figures are shown as a range, not as a known total.

Claims on record

None recorded yet.

Disclosure checklist

Plain checklist, no aggregate score.

Right of reply

Right of reply: open; no response received. Email marco@prismaticlabs.ai. Subject is prefilled. Or see methodology.

Sources

No live planning application link recorded yet. We do not upgrade a site past “proposed” without one.

Map point: longitude -0.05536, latitude 51.6519. Last reviewed 2026-07-20.