Global Switch London East

Global Switch · operating · London Borough of Tower Hamlets

Large Docklands wholesale/colocation hall (GS2). Operator materials describe about 45 MW of power and cooling delivered and ~43 MW of utility supply; a high-density upgrade targets ~74 MW. The 87 MW figure widely quoted in directory summaries is total/gross capacity, not IT load, so it is not used as the headline. Mapped as operating from operator or third-party records; no council planning-application URL is linked.

Stated size

45 MW

biggest size stated for this site Operator

Source: Global Switch London East: about 45 MW of power and cooling delivered (~43 MW utility supply). The commonly-cited 87 MW is total/gross capacity; a high-density upgrade targets ~74 MW.

The largest megawatt figure on the public record for this one site (planning docs or operator materials). It may include stages that are not built yet. Not everyday electricity use; the source sits with the number. Stated size is not electricity use.

Site area

Unknown

active industrial

What was here: Docklands data-centre campus

Water

Not disclosed

No annual water figure in materials reviewed

Equivalences

No operator on this map discloses expected load factor (the share of peak power used on average), so yearly electricity figures are shown as a range, not as a known total.

Claims on record

None recorded yet.

Disclosure checklist

Plain checklist, no aggregate score.

Right of reply

Right of reply: open; no response received. Email marco@prismaticlabs.ai. Subject is prefilled. Or see methodology.

Sources

No live planning application link recorded yet. We do not upgrade a site past “proposed” without one.

Map point: longitude -0.0035, latitude 51.51094. Last reviewed 2026-07-25.